 |
Provide project report to set up the brewery. |
 |
Assist in land selection for the brewery. |
 |
Provide data for obtaining the NOC from govt.
deptts. |
 |
Provide data for institutional loan for the
project. |
 |
Provide layout of the brewery with equipment
placing. |
 |
Provide technical specifications including civil
load details. |
 |
Assist in civil work by liaisoning with your
architecture and civil contractor. |
 |
Provide detailed project engineering for
complete brewery including utilities, ETP, WTP, packaging. |
 |
Vendor identification and selection for various
machines and equipments. |
 |
Erection and commissioning of the Brewery. |
 |
Turn key projects. |
 |
Provide professionals to run the brewery. |
1. Operational :
|
 |
Cost Reduction |
 |
Quality Improvements |
 |
Process Improvement and Standardization |
 |
Productivity Improvement |
 |
Manpower Standardization |
 |
Wastage Reduction |
 |
Efficiency Improvements |
 |
Systems and Procedures (SOPs) |
 |
Problem Solving |
|
|
2. Up Gradation:
|
 |
Capacity Enhancement |
 |
Process Plant Up Gradation |
 |
Utility Up Gradation |
System Designing
This is one of the most important parts of any project. Our
professional engineers and designers use the latest visual designing
technology to produce state-of-the-art equipment that will serve you
well for years to come.
Fabrication
Our manufacturers use most advanced technologies in design,
engineering and fabrication. Our Indian manufacturer uses most
innovative and state of the art machinery and tools to manufacture
high quality equipments at their facilities at Uttarakhand. We
produce manually operated to fully automated PLC/PC based brewery
systems with very user friendly controls.
Shipping
After manufacturing and testing, our quality control team
completes the final inspection before the equipment is expertly
packed and shipped to your premises, ready for installation. Utmost
care is taken in packing and transportation to avoid any damage to
the equipments.
Installation
Once the equipment arrival at your premises, it is unloaded,
unpacked under supervision of our engineers and then our
installation team takes charge of the site to complete the erection
and installation jobs by assembling and placing the equipments as
per finalized layout and interconnecting them with piping, plumbing
and quality electricals.
Testing
Our expert engineers conduct pressure, vacuum and hydraulic tests
of equipments wherever required, followed by the start-up and
running trials of individual equipments to ensure that every thing
is in order. And then the trial run of complete plant is undertaken.
Beer Production & Training
Brew Force helps you in procurement of quality raw materials.
Our Master Brewer designs beer recipes for you and after water
trials, the beer production starts. We help you in selecting the
desired staff and train them as per requirement.
After Sales Services
We offer a number of services including on-site support to help
you overcome any technical problems you may experience. We provide
free services during the warranty period of one year (the part/parts
worn out or broken due to mishandling, normal wear and tear,
improved usage are not covered under warranty). After the expiry of
warranty period, we provide AMC on nominal charges.